CEC recently completed the project to replace 96 seismic dampers on the Bay Bridge for Caltrans. To gain access to the dampers that are on the lower chord beneath the roadway, CEC installed eight suspended truss platforms that stretched across the width of the bridge.
The final phase of the project was to remove and lower these platforms.
Three cranes working in conjunction were needed for this middle-of-the-night operation, including one on the top deck, one on the lower deck and one on a floating barge.
A construction company with Engineering built into the name. A little different, right? CEC is a construction contractor, but we pride ourselves in problem solving and engineering.
At CEC we live safety each day. For us, making sure our people, our subs, and the public are safe is not box to check, it’s truly an integral part of the job. It’s the first thing new recruits are taught, and it’s the first thing discussed at the morning meetings.
Committed to excellence, California Scaffold Services demonstrates a highly experienced, professional approach with an unrivalled dedication in the industry. We have a proven track record for the most challenging locations.
When is comes to caring for the natural resources of our clients and job sites, we are second to none.